Facilities Management would like to notify the campus of planned electrical power testing scheduled for:

Monday, November 23, 2026, at 5:00 p.m.

Testing will last approximately 4 hrs. and will cause minor disruptions in power. These will last only minutes while power is restored. Facilities Management personnel will be onsite throughout the testing to support the power restoration process as it becomes necessary. 

The Forbes generator will not be operating in support of the testing. Critical research, laboratory, or departmental equipment does have the appropriate backup generator power in the event of an extended outage. Updates will be provided if an unplanned event arises. 

What you should do before leaving campus for the Holiday break:

  • Save your work and shut down computers and other electronic devices.
  • Power down and, where practical, unplug sensitive equipment to help protect against power fluctuations when service is restored.
  • Plan for possible interruptions to network connectivity, Wi-Fi, telephones, printers, card access systems, and other electrically powered services.

This testing is necessary to support the new electrical infrastructure work on campus. All main campus facilities will be affected.