Beginning Wednesday October 16, 2019 continuing through Tuesday October 22, 2019, the western half of the sidewalk on the north side of Gist Hall will be closed.  

The seismic retrofit contractor will be working on completing the remaining section of sidewalk and parking stalls in this area.  Included within this work area are two ramped entrances to the second floor; one providing access to the second level of Gist Hall, and the second access to an ITS work space.  Both of these ramped entrances will be unavailable during this period of work however, the north exterior stairs and sidewalk traveling to the east will remain open.

During this closure, if ramped access is needed, please use the SE building entrance located on the first level of Gist Hall.   

Please see the attached map for the areas referenced above that will be impacted.

This area will be reopened to pedestrian traffic as soon as this work is completed.